Tender Corrigendum :
|
Tender Corrigendum | Deadline has been changes from May 24 2024 12:00AM to Jun 7 2024 12:00AM Date | Tender Corrigendum Publication | Company Web Site - Internet | Tender Corrigendum Document | Can be download by Subscribers | Tender Corrigendum | Date | Tender Corrigendum Publication | Company Web Site - Internet | Tender Corrigendum Document | Can be download by Subscribers | Tender Corrigendum | Date | Tender Corrigendum Publication | Company Web Site - Internet | Tender Corrigendum Document | Can be download by Subscribers | Tender Corrigendum | Deadline has been changes from May 16 2024 12:00AM to May 24 2024 12:00AM Date | Tender Corrigendum Publication | Company Web Site - Internet | Tender Corrigendum Document | Can be download by Subscribers | Tender Corrigendum | Date | Tender Corrigendum Publication | Company Web Site - Internet | Tender Corrigendum Document | Can be download by Subscribers | Tender Corrigendum | Deadline has been changes from Apr 25 2024 12:00AM to May 16 2024 12:00AM Date | Tender Corrigendum Publication | Company Web Site - Internet | Tender Corrigendum Document | Can be download by Subscribers | Tender Corrigendum | Date | Tender Corrigendum Publication | Company Web Site - Internet | Tender Corrigendum Document | Can be download by Subscribers |
|
Product Detail :
|
Design, Supply and construction of Under Ground Amn Bkr (20MT) with pre cast RCC Structure and precast RCC Retaining wall, Side Walls of entire building including retaining wall and side wall beside of the rolling shuttter, Roof Slab as shown in drawing, MS Plate above roof Slab (10mm in single layer and 20mm in two layer) as shown in drawing, Rolling shutter Gear-Operated Type (Mechanical Type) of siz 4 m x 4 m with minimum 1.20mm thick curtain sheet, Deck Sheet-1.2mm Th-S350 Grade, TR-80, MS Tubes for Precast Shuttering, Shuttering Plywood for Precast Panels, Anchor Bolt, Transportation Cost, Erection Cost, Labour Hutment, Staff, Electricity & Water, Excavation, Back Filling, Boulder Soling, PCC, RCC, WBM In Ramp, HDPE Pipe, Reinforcement, Centering & Shuttering, Shredded Rubber, Fire proof Painting Work on RCC Structure, Fire proof Painting work on MS Structure, A PPGI roof sheet, Misc for Dowels Tube, Tape, Wire Loop LS, Electrical Work, Flame proof light, Smoke detectors, Fire proof air conditioning system and humidity control system alongwith necessary control arrangement, Lightening conductor, Fire Alarm System, Fire Fighting System. Qty 30
|