|
Tender Corrigendum :
|
| Tender Corrigendum | Deadline has been changes from Mar 18 2026 12:00AM to Mar 31 2026 12:00AM Corrigendum | | Tender Corrigendum Publication | Company Web Site - Internet | | Tender Corrigendum Document | Can be download by Subscribers |
|
|
Product Detail :
|
Carrying out Part / Part Incomplete works of Construction of 24nos of 3BHK Quarters & 06nos of 4BHK Quarters and Water Corridor (Valve House to WTP) at BHEP Balimela Adhesive for Door Work, Air Release Valve, Aluminum Accessories and Hardware, Aluminum Cladding Sheets, Aluminum Die-Cast handles, Aluminum Extrusion, Aluminum Fabricators, Anchor Fastner, Anti – Termite Treatment, Automatic variable temperature control faucets, Ball Cock, Ball valves with floats, Batch Mix Concrete (BMC), Ready Mix Concrete (RMC), Brass stop & Bib Cock, Butterfly valves, C. I Fitting, C.I Sluice Valve & Non Return Valve, C.I. Manhole Covers, C.P. Fittings, Calcium Silicate False Ceiling, Calcium Silicate Boards, Calcium Silicate Tiles, Carpet Flooring & Skirting, Cement, Cement White, Central Control, Centrifugal Pump, Centrifugally C.I Rainwater Intel fitting, Copper Fittings, Copper Pipes, CPVC Pipes & Fittings, Curtain Rod/Drapery Rod, Dash Fasteners, Diesel engine driven pump, ELCB, Electrical Motors, Epoxy Floor, Fire rated Doors & Frames, Fire Alarm System, Fire Extinguisher, Fire Hydrant Valves, Fire Hose Pipes, Fire Man’s Axe, Fire Panic Exit Device, Fire Tower Bolts, Flush Door Shutters, Flush Valves, G.I. Fittings, G.I. Pipes, Gunmetal Valves, HDPE Pipes, Heat Resistant Paint, Insulation of Hot water pipes, Laminates, Liquid Level Controllers, M.S. Pipe, Non Return Valve, Paints, Paver blocks, Polycarbonate Sheets, PVC Pipes & fittings, Reinforcement Steel, R.O. System, Solar / Solar Hot water system, Stainless Steel Sink, Water Cooler, Water Meter, Water Proofing Agencies, Water Proofing Materials, D.G. Set, Fire Fighting Works, HVAC Works, Presentation & Unified Conferencing System
|
| Tender Detail : |
Carrying out Part / Part Incomplete works of Construction of 24nos of 3BHK Quarters & 06nos of 4BHK Quarters and Water Corridor (Valve House to WTP) at BHEP Balimela |